The main plant/AC is maintained and serviced on a regular basis by Axon Services who have been our main contractor for M&E for the last 10 years. Axon supply us with 24 hour cover as well as site support on Wednesdays each week.
Striped out ground floor bathroom facilities to provide bike storage plus new shower rooms installed on the lower ground floor. A work specification and full set of plans drawn up by our surveyor and available to view here:
History [ scroll down for more ↓ ]
• The building has two supply air handling units located in the basement, namely toilet supply fresh air and main office supply fresh air, these were replaced in 2021
• LED lighting
• Dyson hand dryers
• Newly installed urinals, cisterns and pipework
• Marble polishing
• French Polishing
• LED lighting
• New Desso carpets
• Insulated metal Tile Suspended Ceilings
• Painting and decorating
• French polishing
• Boiler controllers replaced.
• Control module on chiller 1 replaced.
• Water tank + booster set replaced.
• Primary heating pumps replaced.
• Water temperature sensors replaced.
• Cloakrooms on each floor updated (3rd & 4th in 2011) Ground, 1st, 2nd and 5th.
• Rear staircase from Ground to Lower Ground floor refurbished.
• CCTV system was upgraded across the Ground Level.
• Cold water booster set both replaced.
• Pressure release valve installed.
• Pressure set pumps installed.
The main plant/AC is maintained and serviced on a regular basis by Axon Services who have been our main contractor for M&E for the last 10 years. Axon supply us with 24 hour cover as well as site support on Wednesdays each week.
2023
• Expansion vessell installed
• Installation of 31 solar panels
The system that we installed consists of 31 solar PV modules, which will generate in the region of 11,250 kWhs per year.
The National Grid estimates that coal-fired power generation is responsible for 950 grams of carbon per kWh of power generated. As we all strive to reduce our dependency on fossil fuels by installing renewable energy systems such as rooftop solar PV, we reduce the required kWhs from coal, a bit at a time.
Based on that National Grid estimate, the system at 66 Buckingham Gate will help lessen the need for coal-fired power and help
reduce the UK’s carbon footprint by approx. 10.6 tonnes of carbon per annum, and upwards of 300 tonnes of carbon over its expected lifetime of performance.
2022
• Gas boilers and flue installed
• Extract fan replaced
2021
• Air handling unit replaced
2020
• Installation of Primary heating pump
• Installation of Secondary heating
pump
2019
• New water tank installed
• Booster set installation
• Pressurisation unit - Hot installed
• Pressurisation unit - Cold installed
2017
• Installation of chilled water pump